Business social network with 4M professionals
You'll be able to see their introduction and other information once they have accepted your connection request.
View Alexandre AUBRY's
Full Profile
This information is visible only to Wantedly users or the user’s connections
View past posts
View mutual connections
View Alexandre AUBRY's full profile
Project manager for 2nd party inspections: - coordination of inspections of mechanical and electric components according to RCC-M, EN standards and Eskom specifications with inspectors in France, Germany, Italy, Switzerland and United Kingdom - interface with client, contractors and their suppliers for project follow-up and management of non-conformances
Project coordinator for the technical documentation review during conformity assessment of the RCS and NSSS assemblies: - coordination of the regulatory document review (drawings, calculation notes, welding files, non-destructive testing procedures, operational procedures…) according to RCC-M, EN standards and French regulation on nuclear pressure equipment with a pool of specialist engineers - interface with the nuclear safety authority and the manufacturer for project follow-up, management of non-conformances, discussion of technical and regulatory issues Project manager for the evaluation of the technical qualification of high integrity components for MSSS and MFWS lines: - preparation of inspection plan and technical evaluation guidelines for the inspectors - coordination of the inspections according to RCC-M, EN standards and French regulation on nuclear pressure equipment with inspectors and specialist engineers in Europe - interface with the nuclear safety authority, the manufacturer and its suppliers for project follow-up and management of non-conformances
Project manager for the evaluation of the technical qualification of heavy forgings in Europe and Japan: - preparation of inspection plan and technical evaluation guidelines for the inspectors - coordination of the inspections according to RCC-M, EN standards and French regulation on nuclear pressure equipment with inspectors and specialist engineers in France and Japan - interface with the nuclear safety authority, the manufacturer and its suppliers for project follow-up and management of non-conformances